mobilesiteConversionButtonText
mobilesiteConversionCallButtonText

1250 sq ft 2 BHK 2T Apartment in Gardenia Glamour

Basic Details
Amenities14
Specifications

Property Specifications

  • Completed
    Status
  • Jun'14
    Possession Start Date
  • 1250 sq ft
    size
  • 596
    Total Launched apartments
  • Aug'08
    Launch Date
  • Resale
    Availability

Glamour Project is registered on RERA from the folowing RERA ID – UPRERAPRJ7250 Gardenia Glamour (Phase-II). Gardenia Glamour has translated your dreams into a beautiful reality. The best way to transfer your lovely dreams is to pick best of amenities and facilities for you. From flooring to ceiling, bathroom accessories to kitchen, everything at Gardenia Glamour is truly glamorous and gorgeous.

Gardenia Glamour Amenities

  • Gymnasium
  • Swimming Pool
  • Children's play area
  • Club House
  • Well developed landscalped garden
  • Jogging Track
  • Indoor Games
  • Power Backup
  • Lift Available
  • Rain Water Harvesting
  • 24 X 7 Security
  • Car Parking
  • Staff Quarter
  • Vaastu Compliant

Gardenia Glamour Specifications

Doors
Internal:
Flush Shutters
Main:
Teak Wood Frame
Flooring
Balcony:
Anti Skid Tiles
Kitchen:
Anti Skid Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Wooden Flooring
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Tiles
Walls
Exterior:
Weather Proof Paint
Interior:
Oil Bound Distemper
Kitchen:
Ceramic Tiles Dado
Toilets:
Designer Tiles Dado
Others
Windows:
Powder Coated Aluminium Sliding
Fittings
Kitchen:
Granite Platform with Stainless Steel Sink
Toilets:
Branded CP Fittings and Sanitary Ware

Payment Plans

Payment Plan

Price & Floorplan

Price On Request
 2D | 3D
  •  2 Bathrooms
  •  3 Balconies
  •  2 Bedrooms
Report Error

Other properties in Gardenia Glamour

  • 2 BHK
  • 3 BHK

About Gardenia

Elevation
  • 10 Total Projects
  • 3 Ongoing Projects
Similar Properties

Discuss about Gardenia Glamour

comment
G
Jun 05,2014 11:35 am
I have also heard that the residents that the residents took the extreme step after holding a meeting with the builder in January. The residents of the project had staged a protest against the builder and a meeting was held. During the meeting the builder had promised to fix all the issues in the next three months. But even after 5 months the builder did not provide the amenities.
T
Jun 05,2014 01:31 pm
Replied to Gautam It has more than two months that the builder has delivered the project but the developers have failed to meet the promises made to the buyers. The worst part is the society lacks safety and the living standards. The dysfunctional elevators cause a lot of problem for the residents.
Disclaimer
PropTiger.com shall neither be responsible nor liable for any inaccuracy in the information provided here and therefore the customers are requested to independently validate the information from the respective developers before making their decisions related to properties displayed here. PropTiger.com, its directors, employees, agents and other representatives shall not be liable for any action taken, cost / expenses / losses incurred, by you. Read Disclaimer