mobilesiteConversionButtonText
mobilesiteConversionCallButtonText
Last updated: 15-Jun-2021

Kohinoor Group Construction And Real Estate

Images for Logo of Kohinoor Group Construction and Real Estate
  • 38 Years of Experience
  • 31 Total Projects
  • 7 Ongoing Projects
reset
Bedroom
Budget
      Possession within
      City
      More Filters
      Project Status
      Property Type
      Availability
      Bathrooms
      Area (sqft)

        Kohinoor Group Construction And Real Estate

        (31 projects)
        Disclaimer
        Map
        Sort by :
         sapphire-ii Elevation
        7 1
        3D
         coral Elevation
        39 1
        3D
        Images for Project
        28 1
        3D
         kohinoor-jeeva Elevation
        10 1
        Images for Elevation of Kohinoor Tinsel Town Phase II
        6 1
        Search Quick. Stay Updated. 
        Download the PropTiger App for iOS and Android.
        Images for Project
        10 1
        3D
        Images for Elevation of Kohinoor Tinsel County Phase II
        13 1
        3D
        Images for Elevation of Kohinoor Tinsel County Phase I
        12 1
        3D
         abhimaan-homes-phase-i Elevation
        12 1
        3D
         tinsel-town-phase-i Elevation
        8 1
        3D
        Images for Elevation of Kohinoor Abhimaan
        12
        3D
        dummy-Kohinoor Group Construction And Real Estate Presindentia
        1
         grandeur Elevation
        11 1
        3D
         sapphire-pune Elevation
        1
         tinsel-county Images for Elevation of Kohinoor Tinsel County
        25 1
        3D
        The Kohinoor Group was started in 1983 in the dynamic of Mr. Krishna Kumar Goyal.The initial years of group activity was limited trading of cement wall and floor tiles and senitry wears and other materials require for construction. The Group Later diversity into construction and property development.in early nineties. Along with property development, a lot of buying and selling property and thus a solid base with appropriate land bank was being prepared