India's best property portal to buy property in India - Proptiger.com
Possession : Nov'18
Roytech 380 Kalikapur
Price on request
Builder Price
Configuration
3 BHK
Builtup area1 sq M = 10.76 sq ft
1,300 sq ft
Possession Status
Completed
Overview
  • Possession Start Date
    Nov'18
  • Status
    Completed
  • Total Launched apartments
    8
  • Launch Date
    Aug'15
  • Availability
    Resale

More about Roytech 380 Kalikapur

Project Specifications

Doors
Internal:
Sal Wood Frame
Main:
Decorative with Wooden Frame
Flooring
Master Bedroom:
Wooden Flooring
Toilets:
Ceramic Tiles
Living/Dining:
Vitrified tiles
Other Bedroom:
Vitrified tiles
Walls
Interior:
POP Finish
Toilets:
Ceramic Tiles Dado up to Door Height
Kitchen:
Ceramic Tiles Dado up to 2 Feet Height Above Platform
Exterior:
Texture Paint
Fittings
Toilets:
Sanitary Ware and CP Fittings
Kitchen:
Granite platform with stainless steel sink
Others
Frame Structure:
RCC Frame
Points:
Living
Windows:
Aluminium Sliding windows with glass panes
Lobby:
Granite flooring
Wiring:
Concealed copper wiring
Switches:
Modular switches.
Roytech 380 Kalikapur Floor Plans
  • 3 BHK
-
Roytech 380 Kalikapur Amenities

About Roytech Group

Roytech Group
  • Total Projects16
  • Ongoing Projects0

More projects by Roytech Group

Similar Projects

Developer Network

  • 400+
    Reputed Developers