mobilesiteConversionButtonText
mobilesiteConversionCallButtonText
Noida
  • All Cities
  • Greater Noida
  • Bangalore
  • Mumbai
  • Pune
  • Noida
  • Gurgaon
  • Hyderabad
  • Ahmedabad
  • Chennai
  • Kolkata
  • Delhi
  • Ghaziabad
  • Lucknow
  • Jaipur
  • Visakhapatnam
  • Faridabad
  • Nagpur
  • Coimbatore
  • Trivandrum
  • Bhubaneswar
  • Mysore
  • Mangalore
  • Nashik

8.2
Livability
Livability
Excellent
PropTiger’s proprietary Livability Score signifies the quality of life a family will enjoy, living in a particular society and locality. This score is calculated based on data collected on quality of amenities in the nearby area and within society through rigorous effort of our data labs team.
8.2
  • Poor
  • Below average
  • Average
  • Good
  • Excellent
Overview

Future World Future Estate Noida

Under Construction
status
5.5 Acres
total area
618
total launched apartments
Nov'13
launch date
Only available from Builder
availability

Units & Sizes

  • 2 BHK
  • 3 BHK
    • 1050 sq ft -   31.5 L
    • 1075 sq ft -   32.2 L
    • 1145 sq ft -   34.3 L
    • 1250 sq ft -   37.5 L
    • 1390 sq ft -   41.7 L
    • 1395 sq ft -   41.8 L
    • 1460 sq ft -   43.8 L
    • 1495 sq ft -   44.8 L
    • 1695 sq ft -   50.8 L

 31.5 L
2999/ sq ft
 2D
  •  2 Bathrooms
  •  3 Balconies
  •  2 Bedrooms

 32.2 L
2999/ sq ft
 2D
  •  2 Bathrooms
  •  3 Balconies
  •  2 Bedrooms

 34.3 L
2999/ sq ft
 2D
  •  2 Bathrooms
  •  4 Balconies
  •  2 Bedrooms
 2D
  •  2 Bathrooms
  •  3 Balconies
  •  2 Bedrooms

 41.7 L
2999/ sq ft
  •  2 Bathrooms
  •  3 Bedrooms
 2D
  •  2 Bathrooms
  •  3 Balconies
  •  3 Bedrooms

 43.8 L
2999/ sq ft
  •  3 Bathrooms
  •  3 Bedrooms
 2D
  •  3 Bathrooms
  •  3 Balconies
  •  3 Bedrooms
 2D
  •  3 Bathrooms
  •  3 Balconies
  •  3 Bedrooms
Disclaimer
Area
  • Sizes shown are super built up area unless specified otherwise.
Price
  • Builder prices shown are basic sales price (BSP) and do not include other cost items such as clubhouse membership, preferred location charges, parking charges etc.
  • Resale prices shown is price of the lowest cost unit available in the project. Actual price will vary as per the unit purchased by the buyer.
Report Error

Have a property/unit to sell?

Let our advisors help you in selling your property
Sell Your Property

Amenities

  • Gymnasium
  • Swimming Pool
  • Children's play area
  • Club House
  • Cafeteria
  • Multipurpose Room
  • Sports Facility
  • Rain Water Harvesting
  • Intercom
  • 24 X 7 Security
  • Power Backup
  • Lift Available
  • Staff Quarter
  • Jogging Track
  • Vaastu Compliant
  • Car Parking

Specifications

Fittings
Kitchen:
Corian Top with Stainless Steel Sink
Toilets:
Branded CP Fittings and Sanitary Ware
Doors
Internal:
Sal Wood Frame
Main:
Teak Wood Frame and Shutter
Flooring
Master Bedroom:
Wooden Flooring
Balcony:
Ceramic Tiles
Kitchen:
Vitrified Tiles
Other Bedroom:
20X20 vitrified flooring
Toilets:
Ceramic Tiles
Living/Dining:
2x2 vitrified tile flooring
Windows
Windows:
UPVC
Walls
Kitchen:
Ceramic Tiles Dado
Toilets:
Ceramic Tiles Dado
Interior:
All internal paints with OBD paint
Exterior:
Oil Bound Distemper

Construction Updates
last updated on : Nov 21, 2016

  • Tower F Construction Status Aug-16
    Nov, 2016
  • Tower H Construction Status Aug-16
    Nov, 2016
  • Tower I Construction Status Aug-16
    Nov, 2016
  • Tower H Construction Status Aug-16
    Nov, 2016
  • Tower G Construction Status Aug-16
    Nov, 2016
  • Tower F Construction Status July-16
    Nov, 2016
  • Tower I Construction Status July-16
    Nov, 2016
  • Tower G Construction Status July-16
    Nov, 2016
  • Tower G Construction Status June-16
    Nov, 2016
  • Tower F Construction Status June-16
    Nov, 2016
  • Tower H Construction Status June-16
    Nov, 2016
  • Tower I Construction Status June-16
    Nov, 2016
  • Tower G Construction Status Apr-16
    Nov, 2016
  • Tower H Construction Status Apr-16
    Nov, 2016
  • Tower I Construction Status Apr-16
    Nov, 2016
  • Tower F Construction Status Apr-16
    Nov, 2016
  • Tower F Construction Status March-16
    Nov, 2016
  • Tower I Construction Status March-16
    Nov, 2016
  • Tower H Construction Status March-16
    Nov, 2016
  • Tower G Construction Status March-16
    Nov, 2016
  • Tower G Construction Status Feb-16
    Nov, 2016

Payment Plans

Payment Plan

Discuss about Future World Future Estate

We will take care of

  • SEARCH
  • SITE VISIT
  • DOCUMENTATION
  • HOME LOAN
  • EVERYTHING

Enter your details to get callback

  Get CallBack  

Similar Projects